Planning of the necessary organisational and technical measures to achieve the target of 30 % renewable energy (wind and solar) in Azerbaijan’s energy mix by 2030.
Client Ministry of Energy of Azerbaijan
Planning of the necessary organisational and technical measures to achieve the target of 30 % renewable energy (wind and solar) in Azerbaijan’s energy mix by 2030.
Client Ministry of Energy of Azerbaijan
Head of Project Team
Development of an implementation plan for integration of 1500 MW RES that include the necessary investments and necessary measures for network and power plant operators, in particular on the following directions: transmission and distribution grid, SCADA technology, software support, training of staff, increase of flexibility of power plants, political frame
Support for the grid connection of two pilot projects: 200 MW solar park and 240 MW wind farm
Implementation of the project to customer’s satisfaction in time and within budget
Optimization of grid connection design of the two pilot projects – reduction of cost