Implementation Plan for Integration of Renewable Energy Sources in Azerbaijan Power System

Project

Planning of the necessary organisational and technical measures to achieve the target of 30 % renewable energy (wind and solar) in Azerbaijan’s energy mix by 2030.

Client Ministry of Energy of Azerbaijan

 

 

 

 

Implementation Plan for Integration of Renewable Energy Sources in Azerbaijan Power System

Position

Head of Project Team

Implementation Plan for Integration of Renewable Energy Sources in Azerbaijan Power System

Responsibilities

Development of an implementation plan for integration of 1500 MW RES that include the necessary investments and necessary measures for network and power plant operators, in particular on the following directions: transmission and distribution grid, SCADA technology, software support, training of staff, increase of flexibility of power plants, political frame

Support for the grid connection of two pilot projects: 200 MW solar park and 240 MW wind farm

Implementation Plan for Integration of Renewable Energy Sources in Azerbaijan Power System

Results

Implementation of the project to customer’s satisfaction in time and within budget

Optimization of grid connection design of the two pilot projects – reduction of cost