Project
Development of a short- and medium-term optimization program for the transmission grid of Azerenerji.
Establish a program of optimization and rehabilitation of the existing substations and overhead lines based on the diagnostic report (made in 2016) and the root cause analysis of the system collapse in July 2018 as well as analysis of updated information
This work has been performed in close cooperation with the consultant’s experts and management of Azerenerji and MoE.
Client Ministry of Energy and Transmission System Operator of Azerbaijan Republic